SALIM, RIZIQ KHUSNI (2024) ANALISIS PERCEPATAN WAKTU PADA PROYEK “USB” MENGGUNAKAN METODE CPM DAN PERT. Other thesis, Nusa Putra University.
Official Full-Text Document(s)
RIZIQ KHUSNI SALIM .pdf
Download (1MB) Open Access
Bibliographic Details
EPrint ID: 1368
| Item Type: | Thesis |
|---|---|
| Subjects: | Engineering > Civil Engineering |
| Divisions: | Faculty of Engineering, Computer and Design > Civil Engineering |
| Depositing User: | Unnamed user with email liu@nusaputra.ac.id |
| Date Deposited: | 01 Feb 2025 03:58 |
| Last Modified: | 01 Feb 2025 03:58 |
| URI / Permalink: | https://repository.nusaputra.ac.id/id/eprint/1368 |
Item Analytics & Repository Metrics
Indexed in Nusa Putra University Repository with full-text harvesting protocol enabled.