YUSUF P, M. IHSAN (2024) PERENCANAAN PENJADWALAN ULANG PEKERJAAN STRUKTUR DENGAN MENGGUNAKAN KOMBINASI METODE PRECEDENCE DIAGRAMMING METHOD (PDM) DAN PROGRAM EVALUATION AND REVIEW TECHNIQUE (PERT) (Studi Kasus Gedung Islamic Center Cicurug). Other thesis, Nusa Putra University.
Official Full-Text Document(s)
M. IHSAN YUSUF P.pdf
Download (2MB) Open Access
Bibliographic Details
EPrint ID: 1356
| Item Type: | Thesis |
|---|---|
| Subjects: | Engineering > Civil Engineering |
| Divisions: | Faculty of Engineering, Computer and Design > Civil Engineering |
| Depositing User: | Unnamed user with email liu@nusaputra.ac.id |
| Date Deposited: | 30 Jan 2025 04:42 |
| Last Modified: | 30 Jan 2025 04:42 |
| URI / Permalink: | https://repository.nusaputra.ac.id/id/eprint/1356 |
Item Analytics & Repository Metrics
Indexed in Nusa Putra University Repository with full-text harvesting protocol enabled.